Data Center Dataset Schema and Definitions

Learn more about the fields in the Lens Power & Renewables data centers dataset.

Written by Stephanie Scollard

How to Read This Page

  • Name: Exact column header in the dataset.

  • Definition: What the column captures and how it is intended to be used.

  • Applies To: Which record types use this field (Campus, Center, Site).

  • Examples: Short, realistic samples to clarify usage.

Record Types

  • Data Campus: A campus that can host multiple individual data centers; may have planned phases and aggregate attributes.

  • Data Center: A single facility (often one or two buildings). Each row represents a new construction or expansion announcement for that facility.

  • Site: Either a Campus, or a Data Center that is not part of a campus.

Data Center & Campus Status Definitions:

The development lifecycle of a data center is tracked through the following categories:

  • Disclosed: The project details have been made public through official filings or press releases signifying a concrete project

  • Zoning Application: An initial request has been submitted to change or confirm the allowable use of the land.

  • Rezoning: The process of changing the legal classification of the land to permit data center usage is underway.

  • Land Acquired: The developer has secured the property, but formal permitting has not yet begun.

  • Permitting: The project is actively seeking the necessary building, environmental, or utility permits.

  • Permitted: All necessary permits have been granted, allowing the project to move toward physical work.

  • Conditional Use Permit: A specific permit has been granted that allows the data center to operate under certain conditions or restrictions.

  • Local Approval: The project has received the green light from local governing bodies (City Council, Planning Commission, etc.).

  • Construction: Ground has been broken, or the facility is being built/fitted out with mechanical and electrical equipment. This phase includes buildings that are complete but still undergoing commissioning/testing.

  • Operational: The data center has entered commercial service and is actively supporting IT loads.

  • Cancelled: The developer has officially terminated the project before completion.

  • Withdrawn: The application or project has been pulled from the regulatory process by the developer.

  • Denied: Regulatory bodies have formally rejected the applications necessary for the project to proceed.

Column-by-Column Glossary

Name

Definition

Applies To

Examples

ID_Site

Unique identifier for a Site. Sites include: (1) Data campuses, and (2) Data centers not part of a campus.

Site

SC-00123; CAMP-045

Site Name

Assigned name of the Site. Equals campus name for campuses; equals center name for standalone data centers.

Site

Desert Ridge Campus; Maple DC-1

Project ID

Unique identifier for a Data Center project. Multiple announcements for different phases of the same data center share the same Project ID.

Center

PRJ-9087

Campus ID

Unique identifier for a Campus; links a Data Center to its parent campus.

Campus, Center

CAMP-045

Project name

Announced project name, if provided by the reference source.

Center

“Phoenix DC Expansion Phase 2”

Is crypto

Indicates whether the facility is used for cryptomining.

Campus, Center

True

Developer

Primary project developer (operator, colocation provider, or real estate company).

Campus, Center

Acme Colo

Partner

Secondary company associated with the project (developer, operator, owner, or investor).

Campus, Center

State Energy Corp; XYZ Realty

COD

Announced month and year of Commercial Operation Date, if provided. If a year or quarter only is provided, use the final month of that period.

Campus, Center

; Q3 2026 →

State

US state where the project is located.

Campus, Center

AZ; VA

County

County where the project is located.

Campus, Center

Maricopa; Loudoun

City

City where the project is located.

Campus, Center

Phoenix; Ashburn

Existing MW

Existing power capacity (MW) of the facility prior to the change declared in the announcement. Blank if initial construction.

Center

24.0

Development MW

New or incremental power capacity (MW) declared in the announcement.

Campus, Center

Campus=80.0 (sum of 50+30); Center=30.0

Planned MW

Expected power capacity (MW) once complete.

Campus, Center

Campus=200.0; Center=30.0

Existing IT capacity MW

Existing IT power capacity in megawatts (MW), representing current power dedicated to IT equipment.

Campus, Center, Site

Development IT capacity MW

IT power capacity in megawatts (MW) for the development phase, representing the power dedicated to IT equipment.

Campus, Center, Site

Development utility capacity MW

Utility power capacity in megawatts (MW) for the development phase, representing total facility power including cooling and infrastructure.

Campus, Center, Site

Existing development IT capacity MW

Combined existing and development IT power capacity in megawatts (MW).

Campus, Center, Site

Planned IT capacity MW

Planned IT power capacity in megawatts (MW) when the project reaches full build-out.

Campus, Center, Site

Planned utility capacity MW

Planned total utility power capacity in megawatts (MW) when the project reaches full build-out.

Campus, Center, Site

Total site acres

Total acres of the property on which the facility sits. For centers inside a campus, use the campus acreage.

Campus, Site

175.5

Data center acres

Acres of data center buildings, excluding undeveloped land.

Campus, Center

42.3

Development Overall cost (USD million)

Declared cost associated with the development currently identified.

Campus, Center

Campus=1,250.0; Center=350.0

Planned Overall cost (USD million)

Anticipated total cost upon completion.

Campus, Center

Campus=2,800.0; Center=350.0

Land cost (USD million)

Cost of the land on which the facility sits.

Campus, Site

95.0

Taxes and incentives

Announced details regarding state/local taxes, incentives, abatements, or development requirements.

Campus, Center

“10-year property tax abatement; sales/use tax exemption on IT equipment.”

Prior use

Prior use of the land and/or existing power capacity (e.g., industrial, brownfield, power plant).

Campus, Center, Site

Former logistics hub with 115 kV substation

Connectivity

Announced details of network connectivity and carriers (e.g., fiber routes, on-net providers, MMR).

Campus, Center

Dual diverse fiber; on-net: Lumen, Zayo

Energy

Announced details of energy supply and management, including cooling technology and grid infrastructure.

Campus, Center

Utility: APS; 230 kV feed; chilled water; 100 MW PPA (wind)

Notes

General notes about the announcement: building count, crypto details, phase context.

Campus, Center

Phase 1: two 36 MW halls; Phase 2 announced

Energy source

Primary energy source for the data center facility

Campus, Center, Site

Natural Gas

Energy source ID

Unique Wood Mackenzie code identifying energy source entries across the database.

Campus, Center, Site

768972a9-786e-4eb6-b1ee-d9ee2d61a593

Technology

The technology type or classification used in the project.

Campus, Center, Site

Combustion

Technology ID

Unique Wood Mackenzie code identifying technology entries across the database.

Campus, Center, Site

6ddb093d-3b25-4325-b0c9-9e1fb424b64e

Onsite generation

Tags or identifiers related to onsite power generation capabilities.

Campus, Center, Site

Gas

Initial announcement

Earliest reference found for this development, even if details later changed.

Campus, Center

Additional references

Later references regarding the same development; may include updated details.

Campus, Center