Individual projects are not directly selected for inclusion in the Copper Supply Imbalance Table. Instead, the allowances are calculated from the total available production across projects, using weighted assumptions:
70% for brownfield probable projects
50% for greenfield probable projects
20% for mine life extensions
These calculations are detailed annually in the Copper Mine Analysis Excel download, specifically within the PROJSUM for DV and MineLifeExtensions tabs.